Al-Zaher Group Iraq · Oman · Est. 2012
Request a scope

Ten divisions

Hire one.
Or hire the group.

Every capability below sits on our own payroll, under one contract number.

Build a scope
Karbala · Basra · Muscat 400 personnel · 21 finished projects One contract number
Home Noor Al-Zaher The Group
Crushers & QuarryCaravan FactoryCar & Equipment RentalAl-Zaher SchoolsReal EstateDelicious CateringTraining CentreProcurementArms of Iraq
Projects About Contact +964 783 301 8320

Division — Own-source aggregate

Crushers & Quarry

The division that removes the single most common cause of a stalled programme in Iraq: aggregate that never turns up. We run our own pits and crushing lines, so the sub-base under your road belongs to us before it belongs to you.

Zero accident targetISO-aligned QA/QCOwn aggregate source 400 personnel on callKarbala · Basra · MuscatOil & gas approved Modular camps in 4 weeksPlant & operators in-house
3Crushing lines
24/7Production capable
0Third-party suppliers

What you get

Four things, done by our own people.

01

Sub-base & fill

Graded material for roads, pads and hardstands, tested to the spec your contract names.

02

Crushed aggregate

Multiple gradings from a single pit, so the mix stays consistent across the whole job.

03

Bulk haulage

Our own tippers move it. No waiting on a hire fleet during a concrete pour.

04

Plant near site

Where volume justifies it, we bring a crushing line to your project instead of trucking distance.

OUR OWN
GROUND.

Every cubic metre under an Al-Zaher road comes out of an Al-Zaher pit. That is the whole division, and the whole argument.

Karbala · Three crushing lines · 24/7 capable

Why it matters to you

A contractor who buys aggregate is exposed to a market. A contractor who digs it is not. When fuel prices move or a supplier stops answering the phone in July, our price and our programme do not move with them.

Pit face — Karbala
Pit face — Karbala
Crushing line
Crushing line
Loading out
Loading out
Stockpiles
Stockpiles
Bulk haulage
Bulk haulage
Sub-base to site
Sub-base to site

Next step

Tell us the site. We’ll tell you what it takes.

Send a scope and you’ll get a named engineer, an indicative mobilisation plan and a price — not a brochure.