01
Accommodation units
Single, twin and bunk configurations with insulation rated for the summer, not for a brochure.

Iraq · Oman · Est. 2012
Ten divisions
Every capability below sits on our own payroll, under one contract number.
Build a scopeCivil & industrial build
02Own-source aggregate
03Modular accommodation
04Plant, fleet and operators
05Education
06Development & assets
07Camp life support
08Workforce & HSE
09Supply chain
10Manpower
Division — Modular accommodation
We build the units, so we can promise the date. Insulated cabins, offices, kitchens, clinics and ablution blocks fabricated in Karbala for Iraqi and Gulf summers, then trucked and craned into place by the group’s own fleet.
What you get
01
Single, twin and bunk configurations with insulation rated for the summer, not for a brochure.
02
Site offices, conference cabins and secure document rooms, fitted and wired.
03
Stainless kitchens and dining halls sized to the headcount, ready for our catering division to take over.
04
Medical rooms, toilet and shower blocks, laundry — the units that decide whether crews stay.
Four weeks
Nothing on this page is subcontracted. The pad, the panels, the crane and the kitchen all carry the same name.
01
Week 1
Cleared, graded, drained and compacted with our own aggregate before a single unit leaves Karbala.
02
Week 2
Insulated panels, frames and fit-out built for a 50°C summer, not for a photograph.
03
Week 3
Our own cranes and lowbeds place the units. Install never waits on somebody else’s rental window.
04
Week 4
Power, water, kitchen and beds live. Catering walks in the door behind us.

Why it matters to you






Rarely alone
Next step
Send a scope and you’ll get a named engineer, an indicative mobilisation plan and a price — not a brochure.